Footing

Concrete for an 80 ft footing, 16×8 in

An 80 ft run of 16 in × 8 in strip footing. The volume is the trench cross-section times the run. That is 71.11 cubic feet, or 2.63 cubic yards: 119 bags of 80 lb premix or 159 bags of 60 lb, before any waste.

Concrete needed

2.63cubic yards· 2.014 m³· 71.11 ft³
Bags of premix needed for concrete for an 80 ft footing, 16×8 in, by bag size.
Bag sizeBags needed
40 lb238
60 lb159
80 lb119
25 kg173
30 kg144
Planning estimate, with no waste allowance included. Add 5-10% for spillage and over-excavation, and check the yield printed on your bag. Structural work must follow your local building code and an engineer's specification.
Bagged or ready-mix?
Either - check the short-load fee
2.63 yd³ clears the usual one-yard minimum but sits in the short-load band, where most suppliers add a surcharge for anything under about 3-4 yd³. That fee is what decides it: get it quoted, add it to the yard price, and compare against the bag count above at your own bag price.

Same job, other sizes

16 × 8 in footing

Volume for each size. The order columns add 10%, the top of the 5-10% waste allowance, and round bags up.
Sizeft³yd³yd³ to order (+10%)80 lb bags (+10%)60 lb bags (+10%)
10 ft run8.890.330.361722
15 ft run13.330.490.542533
20 ft run17.780.660.723344
24 ft run21.330.790.874053
30 ft run26.670.991.094966
40 ft run35.561.321.456687
50 ft run44.441.651.8182109
60 ft run53.331.982.1798131
80 ft run (this page)71.112.632.9131174
100 ft run88.893.293.62163218

At this size

What changes on an 80 ft footing, 16×8 in

Mixing or ordering it

119 × 80 lb bags is 2.63 yd³ - about 60 mixer batches. At this size the bag count is a costing reference rather than a plan: mixing 119 bags on site cannot keep ahead of the setting edge, so the pour ends up full of cold joints. Ordered by the yard it is part of a single load. Have the crew, the access and the discharge points sorted before anything arrives.

How it is worked out

A strip footing is a long rectangular prism under a wall; a spread footing is a pad under a column. Either way the volume is length × width × depth. Enter the total run of the footing as the length, and the trench cross-section as width × depth.

That volume - 71.11 ft³ - is divided by 27 to give 2.63 cubic yards, and by each bag's yield to give the bag count. An 80 lb bag of premix yields about 0.60 cubic feet, so this job takes 119 of them; bag counts always round up, because you cannot buy part of a bag.

Ordering ready-mix instead? Suppliers sell by the cubic yard (or cubic metre) and usually have a minimum load and a short-load surcharge - worth a call before you choose between bags and a truck.

Formwork

What is being measured

wall aboverun / lengthdepthwidth acrossSTRIP FOOTING