A 12 × 12 ft slab covers 144 sq ft, a size used for a patio, a shed base or a run of walkway. At 6 in thick it holds 72 cubic feet, or 2.67 cubic yards: 120 bags of 80 lb premix or 160 bags of 60 lb, before any waste.

Concrete needed

2.67cubic yards· 2.039 m³· 72 ft³
Bags of premix needed for concrete for a 12×12 ft slab, 6 in thick, by bag size.
Bag sizeBags needed
40 lb240
60 lb160
80 lb120
25 kg175
30 kg146
Planning estimate, with no waste allowance included. Add 5-10% for spillage and over-excavation, and check the yield printed on your bag. Structural work must follow your local building code and an engineer's specification.
Bagged or ready-mix?
Either - check the short-load fee
2.67 yd³ clears the usual one-yard minimum but sits in the short-load band, where most suppliers add a surcharge for anything under about 3-4 yd³. That fee is what decides it: get it quoted, add it to the yard price, and compare against the bag count above at your own bag price.

Same job, other sizes

12 × 12 ft slab

Volume for each size. The order columns add 10%, the top of the 5-10% waste allowance, and round bags up.
Sizeft³yd³yd³ to order (+10%)80 lb bags (+10%)60 lb bags (+10%)
4 in481.781.9688118
5 in602.222.44110147
6 in (this page)722.672.93132176

At this size

What changes on a 12×12 ft slab, 6 in thick

What 6 in is for

6 in is a load thickness: repeated vehicle traffic, a garage or shop floor, a machine or skip pad, anything with a point load. At this depth reinforcement is assumed rather than optional, and the sub-base needs to be as good as the slab - a 6 in slab on soft ground still cracks.

Control joints for this size

At 12 × 12 ft this slab is small enough to pour as a single panel. Control joints go in at roughly 12-18 ft for a 6 in slab (24-36 times the thickness), and both dimensions here are inside that, so no intermediate joint is needed - just isolation material where the slab meets a wall, a step or a post.

Placing 144 ft²

The short side is 12 ft, so a straightedge resting on both forms strikes this off in one pass - a 14 ft screed board gives you the overhang you need at each end. Work back along the 12 ft direction and the whole 144 ft² is within reach of two people without stepping in it.

Mixing or ordering it

120 × 80 lb bags is 2.67 yd³ - about 60 mixer batches. At this size the bag count is a costing reference rather than a plan: mixing 120 bags on site cannot keep ahead of the setting edge, so the pour ends up full of cold joints. Ordered by the yard it is part of a single load. Have the crew, the access and the discharge points sorted before anything arrives.

How it is worked out

A slab is a simple rectangular prism: multiply length × width × thickness. Enter the thickness in inches (it is usually the smallest dimension) and the plan size in feet. Four inches suits patios and walkways; drives and garage floors are usually five to six.

That volume - 72 ft³ - is divided by 27 to give 2.67 cubic yards, and by each bag's yield to give the bag count. An 80 lb bag of premix yields about 0.60 cubic feet, so this job takes 120 of them; bag counts always round up, because you cannot buy part of a bag.

Ordering ready-mix instead? Suppliers sell by the cubic yard (or cubic metre) and usually have a minimum load and a short-load surcharge - worth a call before you choose between bags and a truck.

Formwork

What is being measured